This paper is going to have two parts; part A and part B. the paper is going to be about risk management in a building and construction site whose plan has been given. In part A, the discussion will include different aspects of risk management like hazard identification, risk Assessment, control Measures and implementation of the measures and the monitoring and reviewing the effectiveness of Measures used in construction sites. Part B on the other hand will be about a fault that was observed in the scaffold of the building.
PART A
1. Hazards identification
a. Scaffold
This type of hazard ...